A new deck is decided underneath before it is decided on top. Footing depth, post spacing, joist span, and how the ledger attaches to the house determine whether the structure is sound; the decking material determines how it looks and feels. Homeowners usually start the conversation at the second one, and we walk it back to the first. The ledger connection deserves particular attention in this area. It is where the deck fastens to the house, and it is the most common point of serious failure in decks generally. Water that gets behind an unflashed ledger has nowhere to evaporate, and it works on the rim joist quietly for years. Proper flashing at that connection costs very little during a build and is effectively impossible to correct later without opening up the structure. Above the framing, board layout gets planned around how water leaves the surface and how the sun crosses the space. Orientation is not purely aesthetic here. A deck that runs its boards the wrong way relative to the slope holds water at the joints, and in a climate this dry the resulting wet-dry cycling is harder on the wood than steady moisture would be. You get a layout, a materials recommendation, and the permit position in writing before the build.
The build sequence is layout, footings, framing, inspection, decking, then railing. Where the deck crosses the Pasco permit threshold, and any deck over 200 sq ft or standing more than 30 inches above grade does, we submit to the City of Pasco Building Division and schedule around the five to seven business day residential review. Electrical work for deck lighting is permitted separately through the Washington State Department of Labor and Industries rather than the city. You receive the layout drawing, material specification, and the inspection points where the schedule pauses.

Determines footing locations, deck height, and how the structure meets the house.
Sets the structure that everything above it depends on, sized for the span.
Covers board layout, fastening method, and edge details that keep water moving off.
Proudly serving Pasco, Kennewick, Richland, West Richland, Burbank and Finley for 12+ years.
Ten services, from a full pool deck build down to a railing swap or a season of stain. Every one of them starts the same way: we look at what the structure sits on, how high it stands above grade, and what the sun does to that side of the house through a Tri-Cities summer.

We work Pasco first and five surrounding communities after it. Two of them are unincorporated, which means county permits rather than a city building department, and one runs a municipal electric utility instead of a PUD. Those differences change the sequence, so we sort them out before scheduling.
Frequently Asked Questions
Deck Contractor can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
There is no single price for a Pasco deck. Cost follows the square footage, the height above grade, whether the framing underneath can be reused, the decking material, and whether the railing is wood, cable, or aluminum. A ground-level platform in an existing footprint and an elevated deck with new footings are not comparable jobs. We price after a walkthrough and measurements, not over the phone.
It depends on two numbers. Pasco Municipal Code exempts decks under 200 sq ft that also sit under 30 inches above the ground, so a small ground-level platform can go in without a permit. Cross either threshold and you need one from the City of Pasco Building Division, where residential permits run a five to seven business day review. We confirm which side of that line your project falls on before quoting it.
For a Pasco summer, the honest answer is that surface color matters more than material category. Lighter boards run cooler underfoot than dark ones, in composite and in wood alike. Composite avoids the annual splintering and checking that dry heat causes in softwood, while a good hardwood or cedar stays cooler than most dark composites. We match the material to how the deck is oriented and how often it is used barefoot.
Ask three things. Whether they build decks specifically or take them alongside fencing and general contracting, whether they will tell you the permit threshold before quoting, and whether their past work is in your climate rather than on the wet side of the state. A crew that cannot answer the permit question in the first conversation has not looked at your project yet.
Schedule follows the permit review, the footing and framing inspections, whether concrete has to cure before framing starts, and lead times on decking and railing. A railing replacement on sound framing and a new elevated deck that needs fresh footings sit at opposite ends of that range. We give you the sequence in writing so you can see which steps are ours and which belong to the city.
Wood is cheaper up front and needs a finish schedule. Composite costs more at install and skips the stripping and staining. In this climate the gap widens, because dry heat and hard sun push a softwood deck toward recoating more often than the same deck would need on the coast. The right choice depends on whether you would rather spend the money once or spread it across seasons of maintenance.
At 144 sq ft it sits under the Pasco square footage exemption, so if it also stands under 30 inches above grade it may not need a permit at all, which changes the number. Above that height it does. Beyond permitting, the cost turns on footing depth, decking material, and whether a railing is required at that height.
Only above certain thresholds. Pasco Municipal Code exempts decks that are both under 200 sq ft and under 30 inches above the ground. Cross either one and a permit is required from the City of Pasco Building Division. We measure and confirm which applies before quoting, so the permit cost is not a surprise partway through.
The build itself is usually the shorter part. What sets the overall timeline is the permit review, the footing and framing inspections, concrete cure time before framing can go on, and material lead times on decking and railing. We give you the sequence with the city-controlled steps marked separately from ours.
Most, but the ledger connection has to be done correctly and flashed, and some wall constructions make a freestanding deck the better answer. We look at the wall assembly and the rim joist at the walkthrough. A freestanding structure with its own posts is not a compromise; it is sometimes the more durable choice.
Build Your Pasco Deck
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Deck Contractor needs.
Ready to hear more about expert services at Pasco Deck Contractors?
Contact us today to receive a detailed, no-obligation quote.
Serving West Pasco, Riverview, Road 68, Chapel Hill, Broadmoor, Downtown Pasco & Greater Pasco
Mon–Fri 7AM–5PM | Sat 8AM–3PM | Sun Closed